Projects

United States map
\

Your tooltip content goes here

\

Your tooltip content goes here

Your tooltip content goes here

\

Your tooltip content goes here

\

Your tooltip content goes here

\

Your tooltip content goes here

\

Your tooltip content goes here

\

Your tooltip content goes here

\

Your tooltip content goes here

\

Your tooltip content goes here

\

Your tooltip content goes here

\

Your tooltip content goes here

Your tooltip content goes here

\

Your tooltip content goes here

\

Your tooltip content goes here

\

Your tooltip content goes here

\

Your tooltip content goes here

Your tooltip content goes here

\

Your tooltip content goes here

Your tooltip content goes here

Your tooltip content goes here

Your tooltip content goes here

Your tooltip content goes here

Your tooltip content goes here

Your tooltip content goes here

Your tooltip content goes here

Your tooltip content goes here

Your tooltip content goes here

Your tooltip content goes here

Your tooltip content goes here

Your tooltip content goes here

Your tooltip content goes here

Your tooltip content goes here

Your tooltip content goes here

Your tooltip content goes here

Your tooltip content goes here

Your tooltip content goes here

Your tooltip content goes here

Your tooltip content goes here

Your tooltip content goes here

Key

         \ = Operational     \ = Planned | Under Construction

150 MW in AR

Planned | Under Construction

125 MW in KY

Planned | Under Construction

114 MW in TX

Planned | Under Construction

39 MW in CA

Stair stepping with variable length trackers to optimize capacity. No grading required for undulating site.

28 MW in PA

Planned | Under Construction

25 MW in PA

Planned | Under Construction

24 MW in PA

Planned | Under Construction

12 MW in MA

Planned | Under Construction

10 MW in CO

Optimized capacity on small site constrained by three twisting water drainage features enabled by 1 string tracker design.

8 MW in MA

Planned | Under Construction

8 MW in GA

Simplified foundation with lower embedment depths at site with shallow topsoil.

6.4 MW in NY

Planned | Under Construction

5 MW in SC

Single string trackers optimized long runway.

5 MW in TX

Very dense design (GCR of 50 vs 33 standard)
Site boundaries make standard 3-string tracker infeasible

4 MW in PA

Site designed for for snow loads and optimized for odd shaped parcels.

1.5 MW in CO

Planned | Under Construction